-
Presentation
Presentation
Presentation of concepts and entities involved in Construction Management. Design of the work project and its development. Preparation of contests of civil engineering works contests and actions to be developed until the contracting. Description of the process to carryi out the works: - designer's perspective (geometric and technical identification of the work) - contractor's perspective (cost control, quality and safety) - perspective of the owner of work /supervision (monitoring the execution process under the conditions of the contract) Changes in management procedures resulting from technological and computer developments (Building Information Modelling and use of artificial intteligence)
-
Class from course
Class from course
-
Degree | Semesters | ECTS
Degree | Semesters | ECTS
Master Degree | Semestral | 5
-
Year | Nature | Language
Year | Nature | Language
1 | Mandatory | Português
-
Code
Code
ULHT768-9680
-
Prerequisites and corequisites
Prerequisites and corequisites
Not applicable
-
Professional Internship
Professional Internship
Não
-
Syllabus
Syllabus
1 - Main concepts (2) 2 - Information used for construction (2) 3 - Planning works (2) 4 - Enterprise management (2) 6 - IMI - Evaluation for tax assessment (1) 7 - BIM- Buiding Information System (2) 8 - PRONIC Coding and structure information (1)
-
Objectives
Objectives
Develop the theoretical and practical knowledge necessary for the realization of works and construction projects in the various phases of its realization (project, competition, realization and desmaterialization).
-
Teaching methodologies and assessment
Teaching methodologies and assessment
Elaboration of projects based on BIM methodology, using three-dimensional models and technical information from subcontractors. Increase of robotic tecnics in the use on the construction support equipment. Widespread use of artificial inteliligence.
-
References
References
Diário da República Portuguesa Decreto-Lei nº18/2008 Código dos Contratos Públicos. Diretiva Europeia 2004/18/CE. Organização e gestão de obras. IST (C. MANSO, Armando, outros); Fichas de composição de custos directos na construção de edifícios. Série informações sobre custos - (IC4 LNEC). Lisboa, 1978 (FONSECA, Manuel S;MANSO, Armando) Manual de utilização de programas de Planeamento integrado - Relatório LNEC, 118/90 (C. MANSO, Armando, outros); IC5 Informações sobre custos. Fichas de actualização relativas a Junho de 2013. LNEC, 2013 (BARRIE, D. S. and PAULSON, B.C. Professional Construction Managment; 5rd Edition, McGraw-Will-USA, 2007
-
Office Hours
Office Hours
-
Mobility
Mobility
No